CASE STUDY
Flato Markham Theatre
The theatre is owned and operated by the City of Markham. The name of the venue changed from Markham Theatre to Flato Markham Theatre when FLATO Developments acquired naming rights in April 2012
527-seat stage, Auditorium, Multiple rooms and lounges, Multi-level lobby with a capacity of 500 patrons, Rehearsal hall
The display should be easily accessible from the back for easy maintenance
They required remote access to the display for easy content management
It should be able to run from morning to night and last for years
It should not be overly expensive
Easier and cheaper to maintain
Quick access to the back because each video wall panel was mounted using the Eflyn Push Brackets.
Cheaper, much cheaper. The client would have paid more than double for the same size display had it been one individual screen
In addition to the video wall panels installed at the Markham Theater was the video wall PC hidden in the back. With this PC the client could connect to the video wall via wifi anytime.